Works of art

 

•  Recognition and study sites

•  Determination of geotechnical, hydrological and hydraulic

•  Study of preliminary design and detailed design before implementation

•  Before detailed bill of quantities and cost estimates for achieving

•  Preparation of tender documents for business

•  Impact study on the environmental

•  Monitoring the implementation of the proposed structures

•  Supervision and control work