Recognition and study sites
Determination of geotechnical, hydrological and hydraulic
Study of preliminary design and detailed design before implementation
Before detailed bill of quantities and cost estimates for achieving
Preparation of tender documents for business
Impact study on the environmental
Monitoring the implementation of the proposed structures
Supervision and control work